Lab C1: Build a VCDX-Grade Design Document for VCF 9.0 Brownfield Migration
Objectives
- Produce a 120–180 page VCDX-style design document for a real-world VCF 5.2 → 9.0 migration.
Prerequisites
VCF lab environment deployed and operational
Lab Environment
Standard VCF lab environment for VCDX Defense Preparation
Tasks
Task 1 Lab C1: Build a VCDX-Grade Design Document for VCF 9.0 Brownfield Migration
Produce a 120–180 page VCDX-style design document for a real-world VCF 5.2 → 9.0 migration.
Write the Executive Summary with scope, goals, non-goals (2–3 pages).
Fill out a full RCAR register (Requirements, Constraints, Assumptions, Risks): minimum 25 R, 10 C, 15 A, 10 Risks.
Create conceptual, logical, and physical designs for compute, storage, network, management (40–60 pages total).
Add a Design Quality matrix: Availability, Manageability, Performance, Recoverability, Security — rate each design decision.
Write explicit justification for every design decision with references (≥5 references per major area).
Include operational procedures (runbooks) as an appendix.
Add risk register with mitigation + acceptance owner per risk.
Validation Gate
Check: Verify lab completion
Expected: Lab exercise completed successfully
Common Errors
Final Validation
Lab completed successfully
✓ All steps completed → No errors observed
Cleanup / Restore
• Revert to snapshot if needed
Design Reflection (VCDX)
The design document IS your VCDX artifact — it must demonstrate architectural thinking, not just technical configuration. Panelists evaluate design rationale depth, not page count.